At the end of August, HV Hipot? successfully delivered a batch of high-voltage test equipment to Shandong, including: GDYT series non-partial discharge test system, GDYD-A series intelligent withstand voltage test set, YDQW-50kVA/150kVSF6 inflatable non-partial discharge test transformer, Isolation filter devices, etc.
In the scorching summer, although the sweat has wet the clothes again and again, the colleagues in the workshop are still facing the high temperature, completing the quality inspection of various equipment before leaving the factory, and ensuring that the equipment required by customers can be delivered to their hands on time. At present, this batch of equipment has been packaged and ready to be sent to the customer site.
The customer of this cooperation was established in 1997, and its main business is electrical high and low voltage complete sets of equipment, design and development of composite enclosed insulated busbars, installation, repair and testing. After half a month, the customer expressed that he was very satisfied with the professional and meticulous service of HV Hipot , and believed that the quality of the equipment would certainly live up to its trust. Finally, the equipment was finalized in early August.
Thanks to customers for their trust and support as always, HV Hipot? will definitely make persistent efforts, not forgetting its original intention, and insist on delivering the best quality products to every customer for 20 years!
Post time: Sep-07-2022